
Ministers’ Manual: Infrastructure
What Boyko Borissov’s Cabinet ministers succeeded doing in the 100 days since the start of their mandate?
Elena Dimitrova | 02.11.2009 11:30“In the summer of 2012 you will travel to the see via the Trakia Highway”, Prime Minister Boyko Borissov promised at officially opening the connected underway between Sofia’s two most remote districts – Mladost and Lyulin. And shortly after he took out a construction program, envisaging the building of 65 km highways per year. In total by the end of this cabinet’s mandate Bulgaria should have three fully completed highways, a fourth started, 56 regional solid consumer waste depots, 120 purification stations in larger cities alone, and modern railways and a bit quicker trains. All of this passes through an “extreme makeover” of the style of working with European funds and tenders organization at all – a change of not only service, but also of administration’s thinking and mindset and a lot, a real lot of catching up on what’s left unfulfilled so far. CEDB took a big bite with this promises, what’s to do is wait and see if it could swallow it.
Read whole article